Spring KCA Days
Wanzek Construction Inc Prequal Package 062009.pdf
Size: 143.18 KB
This document is designed as a guide to outside contractors on the requirements of our Contractor Safety Program. The requirements outlined in this document must be implemented before a contractor can start work with Wanzek.
Kansas Wind Farm General Contractors.pdf
Size: 59.99 KB
Nine wind farms are being constructed in Kansas by four general contractors. Download this link to view their names and the subcontracting process.
Ed Cross-The Whole Fracking Story (KCA March 2012).pdf
Size: 6.63 MB
This section includes Powerpoint presentations shared during the conference at Spring KCA Days Thursday, March 29th at the Prairie Band Casino.